you have to enable JavaSript in your browser and install FlashPlayer to see content of the website. Get Adobe Flash player
  main inside home outside home recent projects about us contact us
« PREVIOUS PROJECT NEXT PROJECT »

Islington 1 - auction property refurbished

This house has been bought on auction in summer 2008

It had no central heating, wiring needed replacing

and the roof was leaking.

We've spent 13 weeks there doing:

- Central heating

- Wiring

- Knocking down extension walls and rebuilding them

- Replacing the whole roof structure with new on covered with artificial slate

- Plastering all walls

- Fitting new kitchen + dining area where the old bathroom was

- Relocating bathroom to the first floor

- Adding cloakroom under the stairs

- Loft conversion - into a storage

Total cost of labour on this project was 49.000 pounds

Materials around 15.000 excluding the kitchen

 

Our recent projects:

Gallery of Islington 1 - auction property refurbished

AFTER:

BEFORE: